261 kW Commercial Solar Proposal, Halifax, NS
As Engineered for a Halifax Automotive Dealership Group
Real proposal numbers for a multi-building automotive dealership in Halifax: system design, ITC and CCA stacking, payback, and projected IRR.
This case study is built from an actual OYO Energy commercial proposal, engineered for the client's specific roof and energy usage. The client's name is withheld for privacy. As of publication, this reflects the proposed system as designed, not yet a confirmed completed installation. Figures are illustrative and not a guarantee of results for your property.
A Multi-Building Dealership Group Looking to Control a Rising Fixed Cost
This Halifax-based automotive dealership group uses approximately 267,700 kWh annually across its service and showroom buildings, with NS Power rates climbing every year. A 261 kW rooftop system was engineered to offset roughly 63% of that usage from day one, sized to the available roof area rather than oversized for the sake of a bigger number.

System Specifications
- Solar panels: Tier-1 monocrystalline modules, CSA approved for the Canadian commercial market.
- Microinverters: Hoymiles commercial-grade inverter system, panel-level monitoring included.
- Racking: Engineered rooftop racking rated for Nova Scotia snow and wind loads.
- Design package: full production and consumption forecast with professional engineering stamping, as shown above.
- Installed by: the OYO Energy crew, start to finish. No subcontractors touched this roof.
Tier-1 Panels
CSA approved monocrystalline modules, 30-year warranty and production guarantee.
Hoymiles Inverters
Commercial-grade microinverter system with panel-level monitoring.
Engineered Racking
Rated for Nova Scotia snow and wind loads on a commercial roof.
Full Engineering Package
Production forecast and professional stamping for permitting and interconnection.
What This System Costs, Stacking the ITC and CCA
The CCA figure is illustrative, calculated as 29% (an assumed tax bracket) of the after-ITC balance, not the gross cost. Actual value depends on the client's specific tax position. Both the ITC and the Class 43.1 accelerated CCA write-down are commercial-only benefits; there is no Efficiency Nova Scotia rebate for commercial projects. OYO's corporate team builds a real stacking analysis from your actual proposal.
Actual savings and payback timelines vary based on individual energy consumption, rate changes, system size, and usage patterns. Figures shown are representative of recent OYO Energy installations and are not a guarantee of your specific results.
| Scenario | Net Cost | Year 1 Savings | IRR |
|---|---|---|---|
| ITC only, Day 1 | $328,860 | $51,030 | 18.0% |
| ITC + Year 1 CCA (illustrative) | $233,491 | $51,030 | 24.7% |
| ITC + CCA, Year 5 savings | $233,491 | $57,435 | 27.5% |
IRR scenarios are from the client's actual proposal numbers. Individual results vary based on roof, usage, tax position, and financing terms selected.
Cumulative Savings vs. Staying on NS Power
Modelled from this property's actual proposed system cost and projected NS Power rate increases.
Actual savings and payback timelines vary based on individual energy consumption, rate changes, system size, and usage patterns. Figures shown are representative of recent OYO Energy installations and are not a guarantee of your specific results.
How This Compares as an Investment
At an 18.0% IRR using the ITC alone, and up to 24.7% once the illustrative Year 1 CCA deduction is realized, this proposal compares favourably against a GIC or savings account (3–4%), commercial real estate (6–9%), and the long-run stock market average (10–12%). The return is on capital already budgeted for utility costs, not new spending.
The Timing Behind This Proposal
30% ITC Is Time-Sensitive
The federal phase-down schedule is already legislated. An earlier install locks in the maximum credit.
100% Year 1 CCA Window
Applies to systems placed in service under the current schedule. Earlier install means a larger immediate tax shield.
Commercial Install Slots Are Finite
OYO's commercial calendar fills up; every month of delay is a month of lost savings.
Delay Has a Real Cost
Based on this proposal, waiting 12 months costs roughly $51,030 in forgone first-year savings.